NICKEL AND NICKEL ALLOY PIPES, TUBES
We provide Nickel Alloy Tubes and Pipes in Seamless and Welded. Depends on flexible production arrangements, We offer extremely low MOQ (such as a batch of only 50 kilograms that can be arranged for production) and shorter delivery times (20 to 30 days for shipping)
The Typical Tube/Pipe Making Processes
Standard:
GB12771-91, ASTM A1053/A1053M-06, A268/A268M-05A, A269-07 A270-03A, A312/A312M-06, A358/A358M-05, A632-04 A789/A789M-05b, A790/A790M-05b, A872/A872M-07A, A949/A949M-01(2005).
ASTM B161 B163 B165 B167 B444 B407 B423 B622 B729 B338 B521 B523 B658 B861
Materials available:
ss304, ss316, ss2205, Alloy200, Alloy201, Alloy400, AlloyK500, Alloy600, Alloy601, Alloy625, Alloy718, Alloy800, Alloy800H, Alloy800HT, Alloy825, AlloyC276, AlloyC22, AlloyB2, AlloyB3, Alloy59, Alloy20, etc.s
Standard:
GB/T3091-2015, GB/T9711-2017, SY5037-2000
ASTM A1053/A1053M-06, A268/A268M-05A, A269-07 A270-03A, A312/A312M-06, A358/A358M-05, A632-04 A789/A789M-05b, A790/A790M-05b, A872/A872M-07A, A949/A949M-01(2005).
ASTM: B725 B730 B516 B517 B704 B705 B514 B515 B619 B626 B464 B468 B521 B523 B858 B862
Materials available:
ss304, ss316, ss2205, Alloy200, Alloy201, Alloy400, AlloyK500, Alloy600, Allpy601, Alloy625, Alloy718, Alloy800, Alloy800H, Alloy800HT, Alloy825, AlloyC276, AlloyC22, AlloyB2, AlloyB3, Alloy59, Alloy20, etc.s
Production Processes of Seamless Tube
1. Main production processes (main inspection processes) of hot-rolled seamless steel pipes:
Pipe blank preparation and inspection → pipe blank heating → piercing → pipe rolling → reheating of raw pipe → sizing (reducing) → heat treatment → straightening of finished pipe → finishing → inspection (non-destructive, physical and chemical, bench inspection) → warehousing.
2. Production processes of cold rolled (drawn) seamless steel pipes:
Blank preparation → pickling and lubrication → cold rolling (drawing) → heat treatment → straightening → finishing → inspection
Production Processes of Welded Pipe
welded pipe can be divided into spiral submerged arc welded pipe, straight seam double-sided submerged arc welded pipe and resistance welded pipe.
The production process of spiral steel pipe: The raw materials of spiral steel pipe are strip steel coil, welding wire and flux. Before forming, the strip steel is leveled, trimmed, planed, cleaned, transported and pre-bent. The weld gap control device is used to ensure that the weld gap meets the welding requirements, and the pipe diameter, misalignment and weld gap are strictly controlled. After cutting a single steel pipe, the first three of each batch of steel pipes shall be subject to a strict first inspection system……, Enter to the welded pipe page for details.
Need Nickel Alloy Products for Your Project?
Get quotation, technical datasheets, material certificates and delivery schedule for pipes, tubes, fittings, flanges, plates and bars.
Request a Quote